Well, we are almost complete. I have installed the board, attached the roof, painted the angle iron, put caulk around the connection of the plywood and the 6x6's, begun the shingling of the roof, graded the area, ordered the 3x6- 3 door display case, and begun a small pamphlet dispenser.
Things that need to be done:
1) To be completed Monday
- Finish shingling the roof
- Install a Bumper to prevent cars hitting the board
- Paint the ends of the roof with clear water proofing
2) To be completed after:
- Install copper ridge
- Install display case (upon its arrival)
- Finish and install pamphlet holder
- Configure, print out, and install information to be displayed in display case
Comments (0)
You don't have permission to comment on this page.